What if the key to slashing tailings closure costs and winning community trust is to start the work decades before the mine shuts down?
For Justin Walls, Principal Consultant (Tailings Engineering) at SRK Consulting, the best time to plan for tailings storage facility (TSF) closure is now – not when the mine is about to shut down.
If there was one thing the panel on safe mine closure made clear at this year’s Life of Mine - Mine Waste and Tailings Conference in Brisbane, it’s this: closure is no longer just about sealing off the last truckload and planting grass.