tailings infrastructure

How to grow your own EoRs in 16 years or less with a pathway that’s practical, team-based, confidence-building and tailored for today’s TSF challenges

When Anton Kirsten took the stage at the Life of Mine | Mine Waste and Tailings 2025 conference in Brisbane, he wasted no time outlining a problem that’s been quietly growing into a full-blown crisis: there simply aren’t enough Engineers of Record (EoRs) to go around.

Underground grit meets goldfield ambition as Brightstar powers ahead with drills turning, mills reviving and a 200,000 ounce dream taking shape in WA

A gold developer in Western Australia is pushing ahead with a technically robust, multi-hub production strategy, leveraging its in-house underground mining capability, modular infrastructure design, and aggressive drilling to transform a fragmented portfolio into a scalable mid-tier platform.