Western Australia
As mining companies increasingly operate from hundreds, sometimes thousands, of kilometres away from the pit or plant, one challenge has remained constant – how to give remote teams the same operational context, detail, and situational awareness they’d have if they were standing on site.
When reliable environmental performance data doesn’t exist, simulation can step in – and according to IGO Nova’s Zachary Hearne, it could give Australian producers a market advantage.
When global lenders assess mining projects, it is no longer enough to meet Australian legislation – financiers are demanding alignment with international ESG standards, and the gaps are costing companies time and money.
The future of Australia’s role in critical mineral supply chains may depend less on matching China’s scale and more on proving that secure, trusted supply with ESG credentials is worth paying for.
PLS’ Pilgangoora Operation delivered a standout June quarter, with production volumes up 77 percent and unit operating costs down 10 percent compared to the previous quarter thanks to the integration of the world’s largest lithium ore sorting plant.
Rare earth metallurgy is unlike any other field in mining, and as Damien Krebs told AusIMM’s Metallurgical Society in his webinar Rare Earth Metallurgy 101, every single deposit is a puzzle that defies cookie-cutter solutions.
What if the key to slashing tailings closure costs and winning community trust is to start the work decades before the mine shuts down?
For Justin Walls, Principal Consultant (Tailings Engineering) at SRK Consulting, the best time to plan for tailings storage facility (TSF) closure is now – not when the mine is about to shut down.
If your underground mine is relying on 50 metres of non-line-of-sight vehicle detection, you may already be running outside your critical safety controls.
Henry Dillon, Global Customer Success Manager - Geoscience at Maptek, used his time on stage at APCOM2025 in Perth to challenge one of the industry’s most entrenched habits - treating resource models as static snapshots.
When Elsabe Muller, president and vice president operations of Alcoa Australia, took the stage at Optus Stadium for the WA Mining Club’s July luncheon, she knew the audience expected candour.