When mining operators are faced with the challenge of dewatering a live tailings storage facility (TSF) under 30 metres of cover, conventional engineering approaches often buckle under pressure - literally and figuratively.
In the high-stakes world of tailings storage facility (TSF) construction, ensuring conformance to design and safety standards is a non-negotiable part of the job.
At the AusIMM 2025 Life of Mine - Mine Waste and Tailings Conference in Brisbane, a standout panel on site characterisation dug deep into the evolving challenges - and innovations - facing tailings engineers.